Excavations 2023


This is a temporary blog for presenting the excavations at Perdigões. Posts from 2011 to 2022 are available.

Friday 13 April 2018

0243 - Day 11 / Dia 11

We are almost with two weeks of work. The tholos is starting to look nice, even if highly affected by the ploughing.
Estamos quase com duas semanas de trabalho. O tholos começa a ficar bonito, apesar de muito afectado pela surriba.


Defining the intermediate deposit of clay and stones and the result, where the construction is well perceived (as is the impact of the ploughing).
Definindo o depósito de revestimento intermédio de argila e pedras e o resultado, onde a construção se percebe bem (assim como o impacto da surriba).


And in the alignment of the corridor a post hole.
E no alinhamneto do corredor um buraco de poste.


No comments:

Post a Comment